John and Heather Innis

Home · Our House · Construction Progress · 06/12/07



Construction Progess

June 12, 2007

Framing Second Floor, Stairs Installed, Geothermal Ground Loop Installed


Geothermal Ground Loop Trenches
Geothermal Ground loop Trenches
Geothermal Ground Loop Trenches
Geothermal Ground Loop Trenches Geothermal Ground loop Trenches Geothermal Ground loop Trenches
Second Floor Framing Second Floor Framing Second Floor Framing
Second Floor Framing Second Floor Framing Second Floor Framing
Second Floor Framing Geothermal Ground Loop Trenches Installed Geothermal Ground Loop Trenches Installed
Second Floor Framing Second Floor Framing Geothermal Ground Loop Trenches Installed
Geothermal Ground loop Trenches Geothermal Ground Loop Trenches Installed Rough In Stairs Complete
Second Floor Framing Geothermal Ground loop Trenches Geothermal Ground Loop Installed
Front Hall Coat Closet Second Floor Framing Second Floor Framing
Second Floor Framing Second Floor Framing Second Floor Framing
Second Floor Framing Second Floor Framing Second Floor Framing
Second Floor Framing Second Floor Framing Second Floor Framing
Second Floor Framing Second Floor Framing Second Floor Framing
Geothermal Ground loop Installed Geothermal Ground loop Installed Geothermal Ground loop Installed



Return to our Home Page or Go Back to Construction Progress or Go On to 06/13/07



 Mac and the Mac logo are trademarks of Apple Computer, Inc., registered in the U.S. and other countries. The Made on a Mac Badge is a trademark of Apple Computer, Inc., used with permission.

Made on a Mac

This web site and all content is © 2007 John D Innis

Email me Here!